Dayworks Docket Generator

Build a client-ready dayworks docket that updates live as you type.

Dayworks Docket

Subtotal
Total
Prepared by (signature)

 

Approved by (signature)

Figures are estimates based on the rates entered and are shown for illustration. A dayworks docket records work done. Approval and payment depend on the terms of your subcontract and the instruction given.

Margin on subtotal
%

Dayworks guide

What is a dayworks docket?

A dayworks docket (or daywork sheet) records work carried out on a time-and-materials basis: the labour, plant and materials used, at what rates, usually against an instruction from the client or head contractor. Signed dockets are the backbone of variation and cost-recovery claims on civil projects.

When should you raise a dayworks docket?

Common situations that call for a docket include:

  • Work directed outside your scope or contract rates
  • Delay events that redirect crews to unplanned work
  • Standby time converted to productive dayworks by instruction
  • Emergency or make-safe works

Raise the docket the same day and get it signed while the facts are fresh.

What should a docket include?

  • Your company, the client, the project and a PO or instruction reference
  • The date and a short description of the work performed
  • Labour: who, how many, hours, and rates
  • Plant: items, hours, and rates
  • Materials with quantities and unit rates
  • Any agreed margin, and space for both parties to sign

How DelaySolve helps

DelaySolve generates dockets like this from the delays you log on site: labour, plant, materials, photos and notes already attached, so the docket exists before you leave the gate, backed by a record that holds up commercially.

Dockets straight from your delay records

Log the delay once. DelaySolve builds the docket with the labour, plant, materials and evidence already attached.